BILL MORRIS PARKWAY (HWY 385) EB FROM I-240 TO US 72 (COLLIERVILLE) = 14 MINS (AVG TIME 14 MINS + 0 MINS DELAYS)

BILL MORRIS PARKWAY (HWY 385) WB FROM US 72 (COLLIERVILLE) TO I-240 = 14 MINS (AVG TIME 14 MINS + 0 MINS DELAYS)

I-240 (MIDTOWN) NB FROM I-55 (EXIT 25) TO I-40 (EXIT 1) = 6 MINS (AVG TIME 6 MINS + 0 MINS DELAYS)

I-240 (MIDTOWN) SB FROM I-40 (EXIT 1) TO I-55 (EXIT 25) = 6 MINS (AVG TIME 6 MINS + 0 MINS DELAYS)

I-240 (SOUTH/EAST LEG) EB FROM I-55 (EXIT 25) TO I-40 (EXIT 12) = 11 MINS (AVG TIME 11 MINS + 0 MINS DELAYS)

I-240 (SOUTH/EAST LEG) WB FROM I-40 (EXIT 12) TO I-55 (EXIT 25) = 11 MINS (AVG TIME 11 MINS + 0 MINS DELAYS)

I-40 (OUTLYING ARKANSAS) EB FROM AR-75/EXIT 256 TO STATE HWY 76 (ANDERSON AVENUE-EXIT 56) (I-40 (WEST MEMPHIS/MEMPHIS/TENNESSEE)) = 85 MINS (AVG TIME 85 MINS + 0 MINS DELAYS)

In CRITTENDEN road construction. right lane closed on I-40 (WEST MEMPHIS/MEMPHIS/TENNESSEE) EB between CLUB ROAD (SOUTHLAND DRIVE/MLK JR. DRIVE-EXIT 280) and MOUND CITY ROAD (EXIT 281) as reported by internal

In SHELBY road construction. left lane closed on I-40 (WEST MEMPHIS/MEMPHIS/TENNESSEE) EB between HERNANDO DESOTO BRG () and DANNY THOMAS BOULEVARD (EXIT 1) in MEMPHIS as reported by tdot

I-40 (WEST MEMPHIS/MEMPHIS/TENNESSEE) WB FROM STATE HWY 76 (ANDERSON AVENUE-EXIT 56) TO AR-75/EXIT 256 (I-40 (OUTLYING ARKANSAS)) = 85 MINS (AVG TIME 85 MINS + 0 MINS DELAYS)

In SHELBY road construction. right lane closed on I-40 (WEST MEMPHIS/MEMPHIS/TENNESSEE) WB at HERNANDO DESOTO BRIDGE as reported by internal

In CRITTENDEN road construction. roadway reduced to one lane on I-40 (WEST MEMPHIS/MEMPHIS/TENNESSEE) WB between MOUND CITY ROAD (EXIT 281) and I 40/I 55 as reported by internal

I-55 (OUTLYING ARKANSAS) SB FROM AR 181 (JOINER-EXIT 36) TO HIGHWAY 4 (SENATOBIA - EXIT 265) (I-55 (WEST MEMPHIS/MEMPHIS/MISSISSIPPI)) = 73 MINS (AVG TIME 73 MINS + 0 MINS DELAYS)

In SHELBY road construction. roadway reduced to one lane on I-55 (WEST MEMPHIS/MEMPHIS/MISSISSIPPI) SB between SOUTH PARKWAY (EXIT 10) and MALLORY AVENUE (EXIT 9) in MEMPHIS as reported by internal

In WEST MEMPHIS road construction. left lane closed on I-40/I-55 (WEST MEMPHIS) EB between INGRAM BOULEVARD (EXIT 279) and I-55 SOUTH SPLIT in CRITTENDEN as reported by internal

I-55 (WEST MEMPHIS/MEMPHIS/MISSISSIPPI) NB FROM HIGHWAY 4 (SENATOBIA - EXIT 265) TO AR 181 (JOINER-EXIT 36) (I-55 (OUTLYING ARKANSAS)) = 73 MINS (AVG TIME 73 MINS + 0 MINS DELAYS)

In MEMPHIS long-term road construction on I-55 (WEST MEMPHIS/MEMPHIS/MISSISSIPPI) NB at MALLORY AVENUE (EXIT 9)

In CRITTENDEN road construction. left lane closed on I-40/I-55 (WEST MEMPHIS) WB between I-55 SOUTH SPLIT and INGRAM BOULEVARD (EXIT 279) in WEST MEMPHIS as reported by internal

In CRITTENDEN road construction. left lane closed on I-55 (WEST MEMPHIS/MEMPHIS/MISSISSIPPI) NB between MOUND CITY ROAD (EXIT 3A) and CLUB ROAD (MLK JR. DRIVE-EXIT 4) as reported by tdot

PAUL BARRETT PARKWAY (HWY 385) EB FROM US 51 TO I 40 = 16 MINS (AVG TIME 16 MINS + 0 MINS DELAYS)

PAUL BARRETT PARKWAY (HWY 385) WB FROM I 40 TO US 51 = 16 MINS (AVG TIME 16 MINS + 0 MINS DELAYS)

SAM COOPER BOULEVARD EB FROM HIGHLAND STREET (EXIT 7) TO I-40/240 (EAST) = 4 MINS (AVG TIME 4 MINS + 0 MINS DELAYS)

SAM COOPER BOULEVARD WB FROM I-40/240 (EAST) TO HIGHLAND STREET (EXIT 7) = 4 MINS (AVG TIME 4 MINS + 0 MINS DELAYS)